top of page
craftsyminds

Research topic: Paper Planes for Teaching Construction Production Systems Based on Lean Tool

Authors: Omar Sánchez, María P Revuelta, Adriana Gómez-Cabrera, Luis A Salazar


Year published: 2023



Summary of the Research Paper


summary

This research addresses the challenge of teaching production systems and Lean tools in construction education. Recognizing the difficulty of replicating real-world industry scenarios in the classroom, the study proposes a pedagogical game using paper planes to enhance the teaching process. Focused on Lean tools like Continuous Improvement Cells and 5S, the game underwent development and improvement through the Design Science Research (DSR) method. Comprising three rounds, the game involves designing a production system, implementing Continuous Improvement Cells, and applying 5S principles. The theoretical and practical contribution lies in providing a pedagogical tool for teaching construction production systems based on Lean tools, with positive impacts observed in students’ knowledge assimilation and performance indicators during application to undergraduate and graduate students.


How to cite

APA (American Psychological Association)

Sánchez, O., Revuelta, M. P., Gómez-Cabrera, A., & Salazar, L. A. (2023). Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S. Buildings, 13(2), 558.

Chicago

Sánchez, Omar, María P. Revuelta, Adriana Gómez-Cabrera, and Luis A. Salazar. "Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S." Buildings 13, no. 2 (2023): 558.

Harvard

Sánchez, O., Revuelta, M.P., Gómez-Cabrera, A. and Salazar, L.A., 2023. Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S. Buildings, 13(2), p.558.

MLA (Modern Language Association)

Sánchez, Omar, et al. "Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S." Buildings 13.2 (2023): 558.

Vancouver

Sánchez O, Revuelta MP, Gómez-Cabrera A, Salazar LA. Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S. Buildings. 2023 Feb 17;13(2):558.


bottom of page